what jen does

Life, home, and a little travel

home home + reno Week 18
home + reno

Week 18

Week 18 — image 1

When I was looking back on the pictures from this week, it was hard to believe all of this happened in just 5 days. It was exciting when the house landed on its foundation last week, but man – the progress just keeps happening. Each day was something new.

In one day alone, we added all the windows on the first floor, a front door, and poured the cellar foundation. By the end of the week, nearly one side was shingled and we were only missing 3 doors. All of the wonderful windows were in place – including the big ole kitchen window.

Week 18 — image 2

Nearly every day I’m thankful for Jim the contractor. A perfect example of this was the discussion we had around attic vents. I’m just used to seeing them on all the houses I look at. He quickly explained why they weren’t necessary (older technology) but then took it to another level. He recognized that what I was also asking about was something that I was used to seeing in that space … and perhaps now we might be “missing” something even if we didn’t need it. End result? Jim is going to add some decorative trim towards the top of the house to break up some of the shingles. There is a small chance that we might add in a small window as well. He might have two extras bouncing around in his barn that would be perfect. Excellent problem solving.

House stuff that happened this week:

cellar access got framed out

bulkhead was installed

foundation was complete!

lot was leveled out and filled it around the foundation

some white pipe showed up – maybe for the septic system

all the first floor windows were installed

added a ledge to the kitchen window

installed the front door!

Decision stuff:

decided on the decking

Actions:

actually emailed the very nice kitchen lady

went back to the same plumbing store for the 3rd week in a row

played phone tag with the gas guy

Next week:

meet with the plumber

hopefully meet with the kitchen lady

hopefully meet with the gas guy

think about the back entry – do I want to do granite steps?

Week 18 — image 3

Week 18 — image 4

Week 18 — image 5

Week 18 — image 6

Week 18 — image 7

Week 18 — image 8

Week 18 — image 9

Week 18 — image 10

Week 18 — image 11

Week 18 — image 12

Week 18 — image 13

Week 18 — image 14

Week 18 — image 15

Week 18 — image 16

Week 18 — image 17

[1] Exterior of the house

[2] The basement stairs got framed out

[3] All the master bedroom windows are in!

[4] Front elevation of the house …. no roof shingles yet.

[5] A pile of shingles

[6] South side of the house getting shingled on Friday morning 

[7] Front porch doors have been installed

[8] Dining table windows and kitchen window

[9] Ceiling in the kitchen. You can see the incredibly old shingles from the pre-1950s renovation

[10] Front door has been installed

[11] Apparently the crew likes Hershey Kisses…

[12] “Medium” bedroom

[13] “Small” bedroom … only missing the porch door

[14] Front of the house on Saturday morning

[15] Back of the house on Saturday